Access Before Closing: Inspections, Showings and Early Work at the Property

Last checked: November 2026. General education about Texas law, not legal advice. This site is not a law firm or a brokerage.

Investors sometimes want to start work on a house before closing: clearing junk, getting repair bids, showing the property to potential assignees or even starting renovations. The buyer under contract is not the owner, and the contract usually grants only limited access. This post explains the general legal position and how to get permission properly.

The starting point: the seller still owns the property

Until closing and funding, legal title and, usually, possession remain with the seller (Rule 1). The buyer has only the rights the contract gives (Rule 2). Anything beyond those rights needs the owner's permission.

What TREC resale forms usually allow

The forms usually also make the buyer responsible for repairing damage caused by inspections. Read the access paragraph in the version you signed.

Common requests that need separate permission

RequestLegal concernHow to handle it
Showing the house to potential assigneesMay go beyond contract access; seller's privacy and securityAsk the seller in writing; agree times and who attends
Contractors giving bidsUsually within inspection-type access, but checkTell the seller who is coming and when
Clearing debris or starting repairsWork on someone else's property; liability; mechanic's lien riskWritten agreement with the owner, ideally prepared by an attorney
Moving in or storing itemsPossession before closingUse a written temporary lease; TREC publishes one for licensees

Risks of working before closing

Showings and the section 1101.0045 disclosure

If you bring potential assignees to the property, you are marketing a contract interest, and the disclosure applies to them. Make sure they know you do not own the property, and do not let them believe the seller is selling to them directly unless that is true.

A simple permission letter

A short letter signed by the seller can set out who may enter, when, for what purpose, who is responsible for damage, and that no work will be done without further written agreement. Keep it in the file and give a copy to the seller. More posts are in the blog.